The ESSnuSB Target Station (7th High Power Targetry Workshop, Michigan State University - FRIB, 4-8 June, 2018)

Document #:
ESSNUSB-doc-69-v3
Document type:
Talk
Submitted by:
Piotr Cupial
Updated by:
Piotr Cupial
Document Created:
18 Jun 2018, 11:24
Contents Revised:
12 Sep 2018, 10:33
Metadata Revised:
07 Jun 2019, 16:28
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Other Versions:
ESSNUSB-doc-69-v2
10 Sep 2018, 09:58
Abstract:
The ESSnuSB project, recently granted by the EU H2020 programme for a 4-year design study, proposes to use the protons produced by the linac (2 GeV, 5 MW) of the European Spallation Source (ESS) currently in construction in Lund (Sweden) to deliver a neutrino super beam. It follows the studies made by the FP7 Design Study EUROnu (2008-2012), regarding future neutrino facilities. The primary proton beam line completing the linear accelerator will consist of one or several accumulator rings and a proton beam switchyard. The secondary beam line producing neutrinos will consist of a four-horn/target station, a decay tunnel and a beam dump. To detect the produced neutrinos, a far megaton scale Water Cherenkov detector will be placed at a baseline of about 500 km in one of the existing active mines in Sweden. A challenging component of this project is the enormous target heat-load generated by the 5 MW proton beam. In order to reduce this heat-load there will be four targets, which will be hit in sequence by the compressed proton pulses, thereby reducing the beam power on each target to 1.25 MW. Following the EUROnu studies, a packed bed of titanium spheres cooled with helium gas has become the baseline design for a Super Beam based on a 2-5 GeV proton beam with a power of up to 1 MW per target, with other targets being considered for comparison. The hadron collection will be performed by four hadron collectors (magnetic horns), one for each target. Each of these target/hadron-collector assemblies will receive proton pulses three times more frequently than in present projects, and by an average beam power of 1.25 MW, which is twice as high as in present neutrino projects. The feasibility of the target/horn station for the ESSnuSB project is discussed here.
Files in Document:
Authors:
Associated with Events:
7th High Power Targetry Workshop held on 06 Jun 2018 in East Lanssing, Michigan USS
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9p2, contact Document Database Administrators