- ESSnuSB – Costing meeting (2nd Session) on 19/03/2021 14:00
- ESSnuSB – 15th EC meeting on 08/04/2021 15:30
- ESSnuSB. MS16 (WP5 & WP6). Choice of optimal baseline scenario (M45) on 30/04/2021 10:00
- ESSnuSB. D5.3 Design of the near detector (M42) on 30/06/2021 10:00
- ESSnuSB. MS14 (WP2). Linac modifications (M43) on 31/07/2021 08:00
- ESSnuSB. MS15 (WP3). Full simulation of the accumulation ring (M43) on 31/07/2021 09:00
- ESSnuSB. D6.4 Final physics performance (M45) on 30/09/2021 10:00
- ESSnuSB. MS17 (WP4). Final design of target station (M45) on 30/09/2021 11:00
- ESSnuSB. D5.4 Design of the far detector and its performance evaluation (M46) on 31/10/2021 09:00
- ESSnuSB. D2.4 Conceptual design of the ESS RF power upgrade (M48) on 31/12/2021 08:00
- ESSnuSB. D4.4 Design of the target station (M48) on 31/12/2021 09:00
- ESSnuSB. D1.3 Performance, cost and safety evaluation of the facility (M51) on 31/03/2022 08:00
- ESSnuSB. MS18 (All WPs). Cost and performance evaluation complete (M51) on 31/03/2022 08:00
- ESSnuSB – 3rd Periodic Report (PR3) (M51) on 31/05/2022 05:30
European Unions’ Horizon 2020 : ESSnuSB has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 777419.The webpage reflects only the author’s view. The Commission is not responsible for any use that may be made of the information it contains.