ESSnuSB. D4.1 Optimized design of the magnetic horn (M24)
–
An optimized design of the magnetic horn will be provided, considering requirements from the pulse generator taking into account the beam frequency defined by the other WG.
ESSnuSB. D5.2 Mine evaluation for the far detector (M24)
–
A first mine evaluation for the far detector wil be performed taking into account the size of the detector and geology.
ESSnuSB. D6.2 Physics performance after first optimizations (M24)
–
The physics performance of the facility will be evaluated after the first optimizations and a recommendation for the baseline will be made accordingly.
ESSnuSB. MS7. (WP4) First estimation of neutrino beam intensity (M24)
–
ESSnuSB MS8 (WP5) Design concept of the near detector (M24)
–